June 2002
This is where the coal yard will go.
There will be five tracks in the yard.
Four tracks will go under the chutes and the fifth will run to the
left of the building.
All 5 tracks are in. The cork roadbed is glued down and the track is
positioned for tacking.
I have started to try some landscaping. On the left is the earth tone
dirt and on the right is the light rock base.
The Depot Quarter will feature a service station, a hotel, a passenger
terminal and a freight terminal. There will be a six bay locomotive
roundhouse and turntable.
This is so cool!
I found a neon "DINER" sign that flashes on and off and will be
installed on top of Alex's Diner.